Category: Updates

What is the biggest size yurt?

The largest yurt is 31.5 m (103 ft 4 in) in diameter, and was made by Gan Dege (China) in Inner Mongolia, China, on 31 August 2018. The total area is 800...

What is stadia rod?

: a graduated rod used with an instrument having stadia hairs to measure the distance from the observation point to the place where the rod is positioned...